The Dunsmuir Substation near Qualicum, BC, was constructed in 2004 for the BC Transmission Corporation.
CLIENT | BC Transmission Corporation |
LOCATION | Qualicum, BC |
YEAR | 2004 |
"The price of success is hard work, dedication to the job at hand, and the determination that whether we win or lose, we have applied the best of ourselves to the task at hand."